Estimation of Quantities and Scheduling of Project National Highway No-2 (Agra - Gwalior Bypass) by Indresh Mangal

By: Mangal, IndreshContributor(s): Singh, SudhanshuMaterial type: TextTextPublication details: Solan [HP] Jaypee University of Information Technology 2016Description: 53pDDC classification: SPR 624 MAN
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current library Collection Call number Copy number Status Notes Date due Barcode Item holds
B TECH PROJECT REPORTS B TECH PROJECT REPORTS LRC_JUIT
PROJECT REPORT SECTION SPR 624 MAN (Browse shelf (Opens below)) Copy 1 Not for loan Guided by Abhilash Shukla SP1216139
Total holds: 0

There are no comments on this title.

to post a comment.

Library Home | Contact Us | LRC Help

Copyright @ 2020 LRC
Jaypee University of Information Technology
website hit counter

Powered by Koha