Construction of 4 lane Connector from Delhi Meerut Expressway Km. 50 plus 000 of Pkg-iv to Km. 8 plus 520 of NH-235 in the State of U.P. on EPC Mode by Nischay Thakur

By: Thakur, NischayMaterial type: TextTextPublication details: Solan Jaypee University of Information Technology 2023Description: ix, 61pSubject(s): Civil EngineeringDDC classification: SPR 624 THA
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current library Call number Status Notes Date due Barcode Item holds
B TECH PROJECT REPORTS B TECH PROJECT REPORTS LRC_JUIT
SPR 624 THA (Browse shelf (Opens below)) Not for loan Guided by Saurav and Saurabh Rawat SP1923271
Total holds: 0

There are no comments on this title.

to post a comment.

Library Home | Contact Us | LRC Help

Copyright @ 2020 LRC
Jaypee University of Information Technology
website hit counter

Powered by Koha