Construction of 4 lane Connector from Delhi Meerut Expressway Km. 50 plus 000 of Pkg-iv to Km. 8 plus 520 of NH-235 in the State of U.P. on EPC Mode by Nischay Thakur
Material type: TextPublication details: Solan Jaypee University of Information Technology 2023Description: ix, 61pSubject(s): Civil EngineeringDDC classification: SPR 624 THAItem type | Current library | Call number | Status | Notes | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|
B TECH PROJECT REPORTS | LRC_JUIT | SPR 624 THA (Browse shelf (Opens below)) | Not for loan | Guided by Saurav and Saurabh Rawat | SP1923271 |
Total holds: 0
There are no comments on this title.